Landmark Hospital |
Naples, Florida |
Scope of workNew Construction Renovation Service
Services installedPlumbing
|
|
|
|
Promise Hospital Fort Myers |
Fort Myers, Florida |
Scope of workNew Construction Renovation Service
Services installedHVAC/Mechanical Plumbing Medical Gas 3D MEP Coordination Drawings |
|
56,159sq ft. - 60 bed rehabilitation hospital. Coordinate with fire sprinkler and electrical contractors using 3D MEP coordination software to develop a optimum design within a designated budget. Installation of all HVAC/mechanical: air handling units, RTU kitchen units, cooling units, fans, VAV's, dampers, fire dampers, supply, return, exhaust - double & single walled ducts with insulation , vents diffusers and hangers. Installation of all plumbing: cold water, hot water, return water, 140 degree supply, 140 degree return lines, insulation as needed, valves, gravity drains, vents, reserve tanks and water heaters. Installation of all Medical Gas: vacuum pump, vacuum lines, Oxygen lines and valve as needed.
|
Owner Promise Healthcare, Inc General Contractor: Freese Johnson, LLC Architect: Ascension Group Architects LLP Engineer: La Fuess
|
Healthsouth Rehabilitation Hospital of Martin County |
Stuart, Florida |
(Under Construction)
|
Scope of workNew Construction Renovation Service
Services installedHVAC/Mechanical Plumbing Medical Gas 3D MEP Coordination Drawings |
49.141Sq ft. - 34 bed rehabilitation hospital. Coordinate with fire sprinkler and electrical contractors using 3D MEP coordination software to develop a optimum design within a designated budget. Installation of all HVAC/mechanical: air handling units, RTU kitchen units, cooling units, fans, VAV's, dampers, fire dampers, supply, return, exhaust - double & single walled ducts with insulation , vents diffusers and hangers. Installation of all plumbing: cold water, hot water, return water, 140 degree supply, 140 degree return lines, insulation as needed, valves, gravity drains, vents, reserve tanks and water heaters. Installation of all Medical Gas: vacuum pump, vacuum lines, Oxygen lines and valve as needed.
|
General Contractor: Hoar Construction Architect: Fredrick & Associates Engineer: CRS Engineering & Design Consultants
|
Doctors Hospital of Sarasota |
Sarasota, Florida |
Scope of workNew Construction Renovation Service
Services installedHVAC/Mechanical Plumbing Medical Gas 3D MEP Coordination Drawings |
|
77,337sq ft. - 155 bed rehabilitation hospital. Coordinate with fire sprinkler and electrical contractors using 3D MEP coordination software to develop a optimum design within a designated budget. Installation of all HVAC/mechanical: air handling units, RTU kitchen units, cooling units, fans, VAV's, dampers, fire dampers, supply, return, exhaust - double & single walled ducts with insulation , vents diffusers and hangers. Installation of all plumbing: cold water, hot water, return water, 140 degree supply, 140 degree return lines, insulation as needed, valves, gravity drains, vents, reserve tanks and water heaters. Installation of all Medical Gas: vacuum pump, vacuum lines, Oxygen lines and valve as needed.
|
General Contractor: Phoenix Medical Construction Co., INC Architect: Chancey Design Partnership Engineer: Mohan Engineering INC.
|
Healthsouth Rehabilitation Hospital of Marion County |
Ocala, Florida |
Scope of workNew Construction Renovation Service
Services installedHVAC/Mechanical Plumbing Medical Gas 3D MEP Coordination Drawings |
|
48,477sq ft. - 40 bed rehabilitation hospital. Coordinate with fire sprinkler and electrical contractors using 3D MEP coordination software to develop a optimum design within a designated budget. Installation of all HVAC/mechanical: air handling units, RTU kitchen units, cooling units, fans, VAV's, dampers, fire dampers, supply, return, exhaust - double & single walled ducts with insulation , vents diffusers and hangers. Installation of all plumbing: cold water, hot water, return water, 140 degree supply, 140 degree return lines, insulation as needed, valves, gravity drains, vents, reserve tanks and water heaters. Installation of all Medical Gas: vacuum pump, vacuum lines, Oxygen lines and valve as needed.
|
General Contractor: Hoar Construction Architect: Fredrick & Associates Engineer: MBA Structural Engineers
|