MEDIC AIR SYSTEMS INC.

HVAC, MECHANICAL, PLUMBING AND MEDICAL GAS CONTRACTOR

 

 

Landmark Hospital

Naples, Florida

 

Scope of work

New Construction

Renovation

Service

 


Services installed

Plumbing

 

 

 

 

 

 

 

 

 

Promise Hospital Fort Myers

Fort Myers

, Florida

 

Scope of work

New Construction

Renovation

Service

 


Services installed

HVAC/Mechanical

Plumbing

Medical Gas

3D MEP Coordination Drawings

56,159sq ft. - 60 bed rehabilitation hospital.

Coordinate with fire sprinkler and electrical contractors using 3D MEP coordination software to develop a optimum design within a designated budget.

Installation of all HVAC/mechanical: air handling units, RTU kitchen units, cooling units, fans, VAV's, dampers, fire dampers, supply, return, exhaust - double & single walled ducts with insulation , vents diffusers and hangers.

Installation of all plumbing: cold water, hot water, return water, 140 degree supply, 140 degree return lines, insulation as needed, valves, gravity drains, vents, reserve tanks and water heaters.

Installation of all Medical Gas: vacuum pump, vacuum lines, Oxygen lines and valve as needed.

 

Owner Promise Healthcare, Inc

General Contractor: Freese Johnson, LLC

Architect: Ascension Group Architects LLP

Engineer: La Fuess

 

 

 

 

 

 

Healthsouth Rehabilitation Hospital of Martin County

Stuart, Florida

(Under Construction)

Healthsouth Rehab hospital Ocala Healthsouth Rehab hospital Ocala

Scope of work

New Construction

Renovation

Service

 


Services installed

HVAC/Mechanical

Plumbing

Medical Gas

3D MEP Coordination Drawings

49.141Sq ft. - 34 bed rehabilitation hospital.

Coordinate with fire sprinkler and electrical contractors using 3D MEP coordination software to develop a optimum design within a designated budget.

Installation of all HVAC/mechanical: air handling units, RTU kitchen units, cooling units, fans, VAV's, dampers, fire dampers, supply, return, exhaust - double & single walled ducts with insulation , vents diffusers and hangers.

Installation of all plumbing: cold water, hot water, return water, 140 degree supply, 140 degree return lines, insulation as needed, valves, gravity drains, vents, reserve tanks and water heaters.

Installation of all Medical Gas: vacuum pump, vacuum lines, Oxygen lines and valve as needed.

 

General Contractor: Hoar Construction

Architect: Fredrick & Associates

Engineer: CRS Engineering & Design Consultants

 

 

 

 

 

 

Doctors Hospital of Sarasota

Sarasota, Florida

Doctors Hospital of Sarasota Sarasota, Florida

Scope of work

New Construction

Renovation

Service

 


Services installed

HVAC/Mechanical

Plumbing

Medical Gas

3D MEP Coordination Drawings

77,337sq ft. - 155 bed rehabilitation hospital.

Coordinate with fire sprinkler and electrical contractors using 3D MEP coordination software to develop a optimum design within a designated budget.

Installation of all HVAC/mechanical: air handling units, RTU kitchen units, cooling units, fans, VAV's, dampers, fire dampers, supply, return, exhaust - double & single walled ducts with insulation , vents diffusers and hangers.

Installation of all plumbing: cold water, hot water, return water, 140 degree supply, 140 degree return lines, insulation as needed, valves, gravity drains, vents, reserve tanks and water heaters.

Installation of all Medical Gas: vacuum pump, vacuum lines, Oxygen lines and valve as needed.

 

General Contractor: Phoenix Medical Construction Co., INC

Architect: Chancey Design Partnership

Engineer: Mohan Engineering INC.

 

 

 

 

 

 

Healthsouth Rehabilitation Hospital of Marion County

Ocala, Florida

Healthsouth Rehab hospital Ocala

Scope of work

New Construction

Renovation

Service

 


Services installed

HVAC/Mechanical

Plumbing

Medical Gas

3D MEP Coordination Drawings

48,477sq ft. - 40 bed rehabilitation hospital.

Coordinate with fire sprinkler and electrical contractors using 3D MEP coordination software to develop a optimum design within a designated budget.

Installation of all HVAC/mechanical: air handling units, RTU kitchen units, cooling units, fans, VAV's, dampers, fire dampers, supply, return, exhaust - double & single walled ducts with insulation , vents diffusers and hangers.

Installation of all plumbing: cold water, hot water, return water, 140 degree supply, 140 degree return lines, insulation as needed, valves, gravity drains, vents, reserve tanks and water heaters.

Installation of all Medical Gas: vacuum pump, vacuum lines, Oxygen lines and valve as needed.

 

General Contractor: Hoar Construction

Architect: Fredrick & Associates

Engineer: MBA Structural Engineers