Healthsouth Rehabilitation Hospital of Martin County |
Stuart, Florida |
(Under Construction)
|
Scope of workNew Construction Renovation Service
Services installedHVAC/Mechanical Plumbing Medical Gas 3D MEP Coordination Drawings |
49.141Sq ft. - 34 bed rehabilitation hospital. Coordinate with fire sprinkler and electrical contractors using 3D MEP coordination software to develop a optimum design within a designated budget. Installation of all HVAC/mechanical: air handling units, RTU kitchen units, cooling units, fans, VAV's, dampers, fire dampers, supply, return, exhaust - double & single walled ducts with insulation , vents diffusers and hangers. Installation of all plumbing: cold water, hot water, return water, 140 degree supply, 140 degree return lines, insulation as needed, valves, gravity drains, vents, reserve tanks and water heaters. Installation of all Medical Gas: vacuum pump, vacuum lines, Oxygen lines and valve as needed.
|
General Contractor: Hoar Construction Architect: Fredrick & Associates Engineer: CRS Engineering & Design Consultants
|