Franklin House |
Youngsville, North Carolina |
Scope of workNew Construction Renovation Service
Services installedHVAC/Mechanical Plumbing Medical Gas 3D MEP Coordination Drawings |
|
24,213sq ft. - 54 bed rehabilitation hospital. Coordinate with fire sprinkler and electrical contractors using 3D MEP coordination software to develop a optimum design within a designated budget. Installation of all plumbing: cold water, hot water, return water, 140 degree supply, 140 degree return lines, insulation as needed, valves, gravity drains, vents, reserve tanks and water heaters. Installation of all Medical Gas: vacuum pump, vacuum lines, Oxygen lines and valve as needed.
|
Owner: Smith/Packett Med-Com, LLC. General Contractor: Integrated Construction LLC. Architect: Stewart & Conners Architects, Engineer: FDH Engineering
|