Brooks Health System - Bartram Campus - Skilled Nursing Facility |
Jacksonville, Florida |
(Under Construction) |
Scope of workNew Construction Renovation Service
Services installedHVAC/Mechanical Plumbing Medical Gas 3D MEP Coordination Drawings |
76,762Sq ft. - 98 bed rehabilitation hospital. Coordinate with fire sprinkler and electrical contractors using to develop a optimum design within a designated budget. Installation of all HVAC/mechanical: air handling units, RTU kitchen units, cooling units, fans, VAV's, dampers, fire dampers, supply, return, exhaust - double & single walled ducts with insulation , vents diffusers and hangers. Installation of all plumbing: cold water, hot water, return water, 140 degree supply, 140 degree return lines, insulation as needed, valves, gravity drains, vents, reserve tanks and water heaters. Installation of all Medical Gas: vacuum pump, vacuum lines, Oxygen lines and valve as needed.
|
Owner: Brooks Health Systems. General Contractor: Fickling Construction Inc. Architect: O'Keefe-Painter Architects LLC. Engineer: Mohan Engineering, Inc.
|